Water park equipment installation stage work focus

In China, two or three months before the new water park every summer is the basis of the ongoing construction and equipment installation phase, on-site construction in full swing, how active in the water park to build the blue tide line of the project is to promote efficient guide it? Combined with practical experience of many water park, water park Guangzhou blue tide Equipment Co., gives the following summary:


七彩组合滑梯


1. From the actual operation and management needs, and supply units, design units, construction units deployed linkage between professional docking, mainly to see the basic design combined unreasonable, whether the construction drawing design and project specific practical, construction review and so on.

2. Production technology, such as embedded parts, piping, positioning, elevation, and materials used in the equipment base platform. At the same time, the underground comprehensive pipeline laying management guidance will be carried out to ensure the correct development of the foundation construction direction.

3. Cooperate with the supervision unit to do a good job in the control of each step of the process to ensure the steady progress of various processes.

4. Standardized and standardized operation guidance, supervising the installation work and details of equipment comply with industry standards and national regulations, guiding the safe construction of workers and the safety management of equipment installation, and reducing accident risks.

5. Check whether the purchased water park equipment and materials meet the model, specification, quantity and quality of the design documents in compliance with the national standards, save the relevant documents of the equipment for future reference, and check the main parts, links and concealed works during the installation process. construction inspection visas for key parts of the process to carry out the whole process next station management, quality control engineering.

6. Due to the internal and external factors such as the weather, the project construction will have different degrees of impact. In order to make the project open as planned, the importance of progress management need not be said . Of course, the circumstances of each water park vary, blue tide operational management team will combine the characteristics of each of a water park with different management schemes, flexibility to deal with.

7, the water park preparation project has a lot of content, it is inevitable that there will be such problems, let the owners pay attention. In this regard, the blue tide operation management team will give full play to the advantages of professional technology and assist the industry to do relevant control measures.

As more and more water parks are emerging, how to ensure that the project preparation process detours wrong way and in the right direction, healthy, steadily, falling to operate smoothly, many think that the current stage of the season against splashing summer water park The main contradiction faced by investors.