We are always inseparable from building materials and furniture, especially building materials, which are the basis for the renovation of new homes. In order to save time, in order to save the budget, many consumers will have a good order before the house starts to be renovated. However, many building materials and furniture should be matched with the home improvement process, or if the construction is to a certain extent, the specific model can be determined. If the furniture process is wrong, then the later stage will not match the whole home decoration style, or the model or return will be changed because it is not applicable, which will affect the overall process of home improvement. Convenience and cost-effectiveness are not always beneficial to us. Some troubles cannot be saved. Some budgets must also be spent. If you really need to do this, you must communicate with the designers in advance.
So, let's first take a look at what is generally included in home improvement building materials.
There are several types of home improvement building materials: wire (strong wire, weak wire); water pipe (cold pipe, hot water pipe); wood (wood square, wood); tile (wall tile, floor tile, exterior wall tile) , interior wall tiles); paints, coatings, household appliances (cookers, lighting, smart equipment, air conditioning, etc.); parts equipment (kitchen, bathroom appliances); fastener materials (chemical bonding agents, hardware fasteners); decorative hardware accessories , glass, mirror, etc.
First, the home improvement can be purchased before the start of construction
1. Geothermal heating: Since geothermal heating requires four to five days of construction, in the geothermal heating construction, the renovation works cannot be carried out. Therefore, it is recommended that the owners who have a better understanding of the geothermal heating products can complete the geothermal heating construction before they are installed at home. Save time.
2, wire and cable: To be honest, this part belongs to the most basic building materials, in advance must buy high-quality wire, put an end to poor quality wire and cable because it is related to the family's electricity safety and personal safety; colleagues this part must be renovated beforehand Because many lines are buried in the ground or in the wall, the later modification is more laborious. (However, this part of the wire and cable generally does not require the owner to personally go to buy, in advance, the decoration team or the decoration company has purchased and installed, or has already installed the house when it is delivered)
3, central air conditioning: before starting work, it is best to set the first.
Extended reading: have to look at: the top ten details of the second-hand house renovation you must know
4, cabinet: mainly the design of the functional partition, initially need to set the cabinet manufacturers before the hydropower transformation, let the manufacturers to carry out preliminary measurements, determine the location of the cabinet, the way of use and the location of electrical and water circuits. After the bricks are finished, the cabinet manufacturer performs the second measurement, and then communicates with the designer to determine the color style and various ways of the cabinet. Recommended purchase time: before the hydropower transformation started.
5, heating: If the structure or area of ​​the room changes, the number of radiators required will change accordingly, so the pre-custom heating is not in line with the needs of the entire room. Recommended purchase time: After the design plan is determined.
Second, the home decoration mid-term and renovation construction purchase simultaneously
1. Tile: It should be purchased in conjunction with the overall planning of the house. If you determine that the house structure will not change, you can order the tiles in advance, or even the tile model. However, if structural changes occur later, the tiles are likely to be unusable due to changes in the floor space.
For example, in a 3.6 square meter room, the owner has ordered 600×600 bricks. If the designer changes the space and the room area becomes 4 square meters, it is more appropriate to use 800×800 bricks. In this case, the owner needs to replace the tiles. Recommended purchase time: After the structural transformation plan is determined.
2. Sanitary Ware: According to the introduction of the designer of Kuoda, the length and width of the toilet, hand basin and wooden cabinet need to be determined according to the actual proportion of the bathroom space. Although the owner can measure the specific data such as the pit distance, length and width, many owners often only consider the length of the wooden cabinet and ignore the width. For example, most wooden cabinets are placed in the bathroom entrance. Many owners ignore the width of the door line and occupy a certain width. If the width of the wooden cabinet is the same as the width of the entrance door, the wooden cabinet cannot be installed after the door cover is completed, and it needs to be returned.
The length of the toilet is also easy to conflict with the location of the shower area. Inexperienced owners are advised not to rush to customize the product. Otherwise, even if the size can be installed, it may cause the proportion of the sanitary ware in the bathroom to be out of balance, and the perfect decorative effect is not achieved. . Recommended purchase time: After the furniture floor plan is released.
3. Floor: The general owner only considers the wear resistance of the floor and other indicators, and rarely considers the thickness problem. If there are paving and paving in different rooms, because the bricks are usually thicker, if the thickness of the floor is not enough, it is easy to cause the height of the whole space to be different, and the ground is not flat, which brings inconvenience to life. Although the ground can be kept at the same height by leveling the floor or adding keels, the addition of the process is both costly and error-prone. Recommended purchase time: after tiling.
4, aluminum gusset: It is recommended to buy integrated ceiling, the whole style is unified and relatively safe. Specific styles and colors need to wait until the wall tiles are attached before listening to the designer's suggestion.
5, closet door: wall cabinets are made by manufacturers, can be done in advance, but the closet door is related to the level of the ground level, if the ground height is not considered, the closet door may not be installed. Even if you know the thickness of the floor, because the ground of the whole room is on a horizontal surface, the ground may need to be leveled, and the height cannot be determined, so it cannot be customized. Recommended purchase time: After the ground leveling is done, measure the size of the required closet door.
6. Doors: The sizes of the doors produced by various manufacturers are different. Therefore, it is necessary for the manufacturer to measure first, telling the construction workers to enlarge or reduce the opening to a fixed size, and then determine the color of the door after the second measurement by the manufacturer. Recommended purchase time: After the structural transformation plan is released.
Third, the home decoration later combined with the overall style purchase
1. Hardware locks: The manufacturers of general doors have matching locks. Some owners choose to make their own locks for saving. Since the locks are also part of the whole decoration project, the texture is directly related to the surface matching. It is recommended that the owners directly purchase the matching locks. The single purchase also needs to be late, and after the overall style is determined, the color style of the lock is communicated with the designer.
2, switch panel: switch panel is also part of the decoration, the current switch panel style is diverse, need to wait for the entire renovation to complete, consider the overall style and then purchase, is conducive to the coordination of the entire style.
3, curtains, wallpaper: curtains and wallpapers belong to the decorative part, the design scheme may change during the whole decoration process, or the designer has new inspiration, after the installation, the whole feeling is felt, so the purchase is most suitable after completion.
4. Stairs: For villas, if the styles of the buildings are different, the designers need to study and customize according to the overall style.
5, furniture: later in the home decoration style and designer to buy.
If you don't want to rework later, don't want to regret it, don't want to add more trouble to yourself, then please purchase the building materials furniture in this order. The decoration itself is a very troublesome thing. Only by pursuing every detail can we create a comfortable and perfect home environment for ourselves.
23 Series Staples,Heavy Duty Stapler,Smooth Surface 23/13 Heavy Duty Staples,23/13 Heavy Duty Staples For Wood
SHAOXING YIYOU STATIONERY CO.,LTD , https://www.yiyou-staple.com