Renovation terminology

The total cost of home decoration should be: main material cost + auxiliary material fee + labor fee + design fee + management fee + tax.
(1) The main material refers to the finished and semi-finished materials involved in the construction area or individual project in the decoration and decoration construction, such as wood floors, ceramic tiles, sanitary ware, lamps, hardware and so on.
(2) Auxiliary material fee refers to materials that are difficult to be clearly calculated during decoration and decoration, such as cement, sand, nails, water-based tape, electrical tape, adhesives, etc.
(3) Labor costs refer to the wages of workers consumed in the entire project, such as wagers, carpentry, plumbers, painters, etc.
(4) The design fee refers to the measurement fee, the project design fee and the construction drawing design fee of the pre-construction project. This is not a hard indicator. If you are familiar with this and can control the entire site, you can first list what you have to do. The project, say a rough, and then design while construction.
(5) The management fee refers to the expenses incurred by the decoration and decoration company in the management. This means that for large companies, if you are requesting a small construction team, there is no such fee.
(6) Tax refers to the statutory tax paid by the enterprise to the state in the operation of the engineering business. This is the same as the management fee. If you ask the construction team of the small engineering department, there is no such fee, because they are If the tax is paid, it will not be counted. What is the labor contract? (All-inclusive) The contracting of materials in the home decoration means that the decoration company will take all the work related to the construction, including the purchase of raw materials, accessories, construction, supervision, cleaning of garbage, etc., and the role of the owner. Just pay and check the project. What is a package clearing? (Clearing) In the process of home decoration, the contracting company refers to the decoration company is only responsible for sending workers to carry out on-site construction, and is responsible for the management of the site, and is not responsible for material procurement. All materials are purchased by the owner, including main materials, auxiliary materials, accessories, etc., such as plywood, wood, ceramic tiles, cement, sand, handles, lighting and so on. What is the contractor does not include the main material? (Half-package) In the process of home decoration, the contractor does not include the main material. Some people call it a laborer's auxiliary material. This is a cooperative method commonly used at present. It refers to the owner responsible for purchasing the main materials, such as wall tiles, floor tiles, and wooden floors. , sanitary ware, electric wires, lamps, etc.; in addition to responsible for construction, the decoration company should also be responsible for the procurement of auxiliary materials, including cement, sand, glue (such as latex, wood glue powder, etc.), hardware (such as nails, Gun nails, etc.), auxiliary wood and products, etc. What is a covert project? Concealed works in home decoration, as the name implies, are hidden projects that cannot be seen after the completion of the project. These projects can include waterproofing works (mainly leak prevention in kitchens and toilets), distribution engineering (laying of wires), and wall coverings. The basic treatment (such as the proportion of cement mortar), the basic treatment of the ground, the hidden water and sewage pipelines, the keel of the ceiling, and so on. What is more than half of the project? More than half of the project is generally understood literally, that is, half of the project. However, since it is difficult to classify the project so accurately, there are generally two ways to define it in the home decoration process. One is that the construction period is over half (such as the project that can be completed in the original budget for 60 days, without adding engineering projects. In the case, after 30 days of construction, the construction period can be considered to be more than half); the second is to mark the woodwork in the project without finishing the paint (commonly known as woodworking closing) as a sign of more than half of the project. What is the staged acceptance of the project? Since home improvement includes many engineering projects, and some projects can be carried out after other projects, some projects must be phased in. Generally, the acceptance of concealed works, the acceptance of the facing works, and the general acceptance of the works can be carried out. If the owner's time is sufficient, these acceptance processes can be further divided. For example, in some basic projects, muddy tiles, door changes, partitions, laying and modification of water and power pipes, wiring, etc., as well as floor tiles, waterproofing of kitchens and toilets. What is the completion acceptance? Completion acceptance in home decoration refers to a comprehensive acceptance of all engineering projects after completion of all projects. The completion acceptance is based on the phased acceptance. The engineering projects that have been completed before acceptance are generally not completed during the completion acceptance. Re-acceptance. The basis for completion acceptance is the decoration contract and its attached design plan, the national standard of decoration, industry standards, etc. What is Party A and Party B? Home decoration must sign a renovation contract, whether you are a general construction team (such as a small-scale renovation engineering department), or a large decoration company. Generally, Party A in the contract is the legal owner of the house or the authorized agent designated by the owner in writing. This is the main body in the renovation contract. Party B of the contract basically refers to the construction party of the project--the decoration company. What is engineering supervision? Project supervision is the person who manages the quality of the project on the site and follows up the progress of the project. These people generally have knowledge of the construction profession, such as the civil engineering or decoration engineering graduates of the School of Architecture, or the technical workers or technicians of the construction company. There are also supervising engineers who used to work in the construction team. Most of these people have considerable construction management experience and various construction skills and construction techniques. What is a project change? When decorating a home, it is generally necessary to talk about the construction projects and the specific construction techniques and practices. If the original plan is changed during the specific construction process, such as adding engineering projects or construction techniques, changing materials, etc., this change is called project change. There may be many reasons for the change, perhaps because of Party A, or because of Party B, but no matter which party wants to make changes to the project, it should be approved by the other party, and attention should be paid to the cost of the project. What is clear oil and mixed oil? Clear oil and mixed oil refer to the process of painting woodwork by painters. The clear oil process refers to the direct application of transparent paint (also known as varnish) on the surface of wood with better wood grain. After the operation is completed, it can still be clearly seen. Woody grain has a natural beauty. The oil mixing process means that the painter applies a color opaque paint on the surface of the wood after performing necessary treatment on the surface of the wood (such as repairing nail holes, sandpaper, and putty). The clearing process can be divided into a clear oil process without a background color and a clear oil process with a top color. The oil that does not have the background color is that the painter directly applies the varnish on the surface of the wood after finishing the treatment on the surface of the wood. The result is basically able to reflect the texture of the surface of the wood and the original color, and the realism is relatively strong; Because the process of doing this can not solve the chromatic aberration changes of the wood surface, as well as the defects of the wood itself such as scars on the surface of the wood. The oil-repellent process of the upper color is that before the painter paints, first paint the color of the association, let the customer choose the color according to his own preferences; or the customer has a soft spot for the color of some wood, or can ask for The painter makes paint color samples for himself; the painter makes a ground color (oil color or water color) on the surface of the wood. After the base color is finished and dried, the painter is required to apply the paint according to the predetermined number of times. Paint the surface of the wood until the entire process is completed. What is a wood line? Splint? Decorative panels? These are the main materials for woodworking products. Wood threads are mainly products made of wood, plaster or metal. It is mainly used for the corner closing of various wood products, such as the door frame, the door frame of the wardrobe, the side of the hanging cabinet, the drawer, the side of the writing desk, and the like. There are many kinds of wood lines, and the lengths are different. They are mainly processed from pine, sycamore, eucalyptus and eucalyptus. Its varieties are: nail line (semicircular belt edge), semi-circular line, outer corner line, inner corner line, wall skirt line, baseboard line and so on. The width is as small as 10 mm (nail line) and as large as 120 mm (baseboard, corner line) generally does not exceed 10 mm. The gypsum line is divided into two types: flat line and angle line. The mold is produced and generally has a European pattern. The flat-line supporting flower has a width of about 5 cm and the angle of the flower is different. The corner line is generally used for the corner and hanging top, and the size is different. In addition, there are slots made of stainless steel and titanium plates, wrap angles, etc., and the length is 2.4 meters. In the renovation budget, the wire is in meters. The splint is the main material of woodworking products in home decoration. The wood produced by the wood factory is generally 1.22 meters wide, 2.44 meters long, and has a thickness of 3 mm, 4 mm, 5 mm, 9 mm, 12 mm, 15 mm. Often called 3 PCT, 4 PCT, 9 PCT, 12 PCT, etc. The veneer is a plate used for the surface of woodwork and for decoration. Such as red (white) beech wood veneer, red (white) oak veneer and so on. What is a positive angle? Yinjiao? In the home decoration often heard the Yinjiao Yangjiao, what, what is the Yinjiao? What is a positive angle? The so-called yin angle is the corner we usually call recessed, such as the corner of the room, kitchen, and toilet. The so-called positive angle is the angle that protrudes from a flat angle, such as a column, a beam, a cabinet, and the like.

Document.body.oncopy = function () { setTimeout( function () { var text = clipboardData.getData("text"); if (text) { text = text + " This article comes from China Wooden Door Network, China's well-known wooden door industry portal Website! (http://) Detailed reference: "+location.href; clipboardData.setData("text", text); } }, 100) }

Upholstered Sofas

Upholstered Sofas,Upholstered Sofa For Commercial Dining Room,Commercial Leather Sofa,Commercial Sofass

Foshan Shunde Oubao Luo Intelligent Catering Equipment Co., Ltd. , https://www.aobl-co.com